Configuration table management systemのメーカーや取扱い企業、製品情報、参考価格、ランキングをまとめています。
イプロスは、 製造業 BtoB における情報を集めた国内最大級の技術データベースサイトです。

Configuration table management system×大塚商会 - メーカー・企業と製品の一覧

Configuration table management systemの製品一覧

1~4 件を表示 / 全 4 件

表示件数

Parts Configuration Management System "Production Innovation Bom-jin"

Achieving true end-to-end integration in manufacturing from upstream to downstream through BOM construction for reuse and standardized design - Reuse and Standardized Design Platform.

"80% of product costs are determined at the design stage." "Production Innovation Bom-jin" emphasizes data integration with production management and manages design assets such as drawings and technical information from the design engineering department through a "product ledger." It unifies design rules within the department to achieve standardization and reuse. Additionally, by linking with the production management system "Production Innovation Raijin," it enables true end-to-end integration with the production department, achieving cost reduction, shorter delivery times, and improved production efficiency. This is a tool that supports the construction of "product ledgers" and "bill of materials" focused on parts standardization and production management data integration, streamlining the design engineering department and enhancing the value of deliverables.

  • img-bom-jin-reco-01-02-big[1].jpg
  • img-bom-jin-reco-01-03-big[1].jpg
  • img-bom-jin-reco-02-01-big[1].jpg
  • img-bom-jin-reco-02-02-big[1].jpg
  • img-bom-jin-reco-02-03-big[1].jpg
  • img-bom-jin-reco-02-04-big[1].jpg
  • img-bom-jin-reco-03-01-big[1].jpg
  • img-bom-jin-reco-03-02-big[1].jpg
  • img-bom-jin-reco-03-03-big[1].jpg
  • Other information systems

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Case Study] Preventing Parts Order Omissions through Integration of BOM and 3D CAD

Introducing a case study on the implementation of a parts configuration management system at Y.E.S. Denko Co., Ltd.!

At Y.E.S. Denko Co., Ltd., there were challenges such as wanting to "promote the reuse and standardization of design data and establish a business platform" and "eliminate the missing parts orders that occurred due to analog checks." In response, we introduced the "Production Revolution Bom-jin" as a mechanism for reusing design data. With the establishment of a platform for business standardization, it has become easier to advance merged operations and new business developments. Additionally, by linking 3D CAD with this system, all standard parts, down to a single screw, have been connected to the parts list, creating a system that allows for parts to be ordered without omissions. [Overview] ■ Objectives of Implementation - Promote the reuse and standardization of design data and establish a business platform - Eliminate missing parts orders that occurred due to analog checks ■ Solutions - Introduce a parts list management system to standardize operations - Eliminate discrepancies between CAD data and the parts list by linking 3D CAD with "Production Innovation Bom-jin" *For more details, please refer to the PDF document or feel free to contact us.

  • screenshot_03.png
  • screenshot_04.png
  • screenshot_05.png
  • screenshot_06.png
  • screenshot_07.png
  • Production Management System
  • Other information systems

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Case Study] Achieving standardization and reuse design through BOM construction.

Achieving standardized and reusable design in BOM construction to enhance corporate competitiveness! Introducing a case study of Tohshin Co., Ltd.

Toshin Co., Ltd. is a company that manufactured slitting machines that cut film sheets and roll them up during the early days of the domestic industry. With the rise of latecomer manufacturers, competition intensified. We faced the reality that merely inheriting traditional technologies and development methods would not allow us to win in the competition, and we realized that creating a system to develop new products more efficiently was essential. Therefore, we introduced BOM (Bill of Materials) to standardize and reuse designs. As a result, we have improved estimation accuracy, profit margins, shortened delivery times, and enhanced quality, thereby increasing our corporate competitiveness. [Products Introduced] ■ Bill of Materials Management System 'Production Innovation Bom-jin' ■ Hybrid Production Management System 'Production Innovation Raijin' *For more details, please refer to the PDF document or feel free to contact us.

  • Production Management System
  • Other production management systems

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Case Study] Achieving Standardized Design through BOM Construction

Reducing design man-hours by 30%! Introducing the case study of Kira Corporation.

We would like to introduce a case where Kiracorporation Co., Ltd., a machine tool manufacturer that develops and manufactures small cutting machines and drill presses, implemented the BOM management system "Production Innovation Bom-jin." The company believed that BOM should be utilized from the design stage to transform the entire production process. What caught their attention as a means to realize this ideal was the "Production Innovation Bom-jin" proposed by Otsuka Shokai. After implementation, they achieved a 30% reduction in design workload through standardized design and the use of RPA, allowing them to spend more time on the creative aspects of design. 【Implemented System】 ■ Parts Configuration Management System "Production Innovation Bom-jin" *For more details, please refer to the related links or feel free to contact us.

  • Production Management System

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録